enercret Installation: |
|
|
|
|
|
430 hollow piles dia. 500mm, length 39m were fitted with 100,000m HDPE pipes, dia. 25/2.3mm to extract cooling/heating energy from the ground to cool and heat the factory and office building. |
|
|
|
|
|
|
- |
Client: |
|
Husky Injection Molding Systems
500 Queen St. South
Bolton, Ontario, Canada L7E 5S5 |
|
|
|
|
|
|
- |
Shanghai office: |
|
Husky Injection Molding Systems Ltd. Section A Floor, 1st Building 47
(Plot F 14, district F)
No. 299 Middle Fu Te Road
Shanghai Waigaoguiao Free Trade Zone
P.R. China 20131 |
|
|
|
|
|
|
- |
Architect: |
|
John Buttner
355 Harry Walker Pkwv
Suite4
Newmarket, Ontario, Canada L3Y7B3 |
|
|
|
|
|
|
- |
Engineering Partners: |
|
ATKINS CONSULTANTS Shenzhen Co. Ltd.
Unit 8-16, 53/F Shun Hing Square
Di Wang Commercial Center
5002 Shen Nan Dong Road
Shenzhen, P.R. China
TRANSSOLAR Energietechnik GmbH
Curiestraße 2
Germany - 70563 |
|
|
|
|
|
|
- |
Photos: |
|
  |
|
|
|
|
|
|
 |
Services rendered: |
|
|
|
|
|
|
- |
Consulting |
|
|
|
|
|
|
|
|
- |
Manifold supply |
|
|
|
|
|
|
|
 |
|
|
|
|
 |
enercret Installation: |
|
|
|
|
|
45 hollow piles dia. 330mm, length 28m and 20 hollow piles dia. 130mm, length 30m were fitted with the energy system.
The energy extracted from the ground covers 100% of the heating and cooling requirements of the building. |
|
|
|
|
|
|
- |
Client: |
|
BERMINGHAM Construction Ltd.
Wellington Street Marine Terminal
Hamilton, Ontario L8L 4Z9, Canada |
|
|
|
|
|
|
- |
Architect: |
|
Zeidler Grimell Partnership
315 Queen St. W.
Toronto, ON M5V 2X2, Canada |
|
|
|
|
|
|
- |
Mechanical Engineering Ltd. |
|
Crossey Engineering Ltd.
2255 Sheppard Ave. East
Suite E-331
North York, ON M2J 4Y1, Canada |
|
|
|
|
|
|
 |
Services rendered: |
|
|
|
|
|
|
- |
Consulting |
|
|
|
|
|
|
|
|
- |
Design |
|
|
|
|
|
|
|
|
- |
Simulation |
|
|
|
|
|
|
|
|
- |
Installation drawings |
|
|
|
|
|
|
|
|
- |
Know-how transfer |
|
|
|
|
|
 |
|
|
|
 |
|
|
|