|
|
|
|
|
|
 |
|
|
|
|
 |
Absorber diaphragm walls and absorber piles for harnessing and storing geothermal energy |
|
|
|
|
|
Shopping centre with office premises |
|
|
|
|
|
|
- |
Total surface area: |
|
45,000 m2 |
|
|
|
|
|
|
- |
Retail space: |
|
16,000 m2 |
|
|
|
|
|
|
- |
Office space: |
|
7,000 m2 |
|
|
|
|
|
|
- |
Underground car park: |
|
700 parking spaces |
|
|
|
|
|
|
- |
Client: |
|
DI Michael Auer, Wien - A |
|
|
|
|
|
|
- |
Architect: |
|
DI Ernst H. Huss, Wien - A |
|
|
|
|
|
|
- |
Building services consultant: |
|
Planungsgruppe Grünbichler GmbH & Co KG, Kapfenberg - A |
|
|
|
|
|
|
|
|
|
 |
enercret installation: |
|
|
|
|
|
Activation of the diaphragm wall (12,400 m² equipped) and piles (300 piles; DN 120 cm, 7 m to 20 m long) was performed using approx. 90,000 linear metres of HDPE piping DN 25/2.3mm. The storage capacity of the ground is approx. 1,400 MWh. |
|
|
|
|
|
|
- |
Cooling capacity: |
|
ca. 1,400 kW |
|
|
|
|
|
|
- |
Heating capacity: |
|
ca. 1,200 kW |
|
|
|
|
|
|
- |
Cooling output/year: |
|
ca. 1,670 MWh |
|
|
|
|
|
|
- |
Heating output/year: |
|
ca. 660 MWh |
|
|
|
|
|
|
|
 |
Benefits: |
|
|
|
|
|
|
- |
Energy stored instead of being wasted |
|
|
|
|
- |
Dual purpose of the refrigerator unit for cooling and heating |
|
|
|
|
- |
High performance rating of refrigerator unit/heat pump due to low temperature differences |
|
|
|
|
- |
Savings in respect of boiler and recooling installations |
|
|
|
|
- |
Pay-back time for the additional costs approx. 8 years due to low running costs |
|
|
|
|
- |
Reduction in CO2 emissions of approx. 500 tonnes/year, roughly equivalent to EUR 12,500 in consequential costs |
|
|
|
|
|
|
|
 |
Project sheet download: |
|
|
|
|
|
To download the PDF file, please click here .* ) |
|
|
| * ) |
|
To view PDF files you will need the Adobe Acrobat Reader. If you do not have this software, you can download the Acrobat Reader here free of charge. |
|
|
|
|
|
|
|
|
|
|
 |
|
|
|